Machining of Extrusions

Once the extrusion process is complete, the resulting extrusions will often require finish machining as a secondary operation. Depending on the supplier and the required machining processes, this can sometimes be carried out by the extrusion company in-house; other times, the extruded parts will need to be sent to a precision machining company for this process to take place.

It is quite common for more complex machining processes to be carried out by a machining specialist, who will receive the extrusions on a free-issue basis and complete the necessary operations. This can be anything from drilling to milling, but may provide a more cost-effective alternative to having components machined from solid.

Used to produce

Required secondary machining processes on extruded parts.

Materials

Extruded components, which are free-issued to the machining supplier, are commonly made from aluminium, although they can also be made from plastic, copper, brass, steel, lead, tin and even titanium.

Advantages

Provides a cheaper alternative to having components machined from solid.

Disadvantages

Secondary operations may result in a longer lead time.

Project Statistics Industry

1. START A PROJECT

Upload your drawings in almost any format, such as PDF, DXF, DWG, or Solidworks.

2. RECEIVE QUOTES

Interested suppliers will get in touch with you and provide a quote directly, saving you time.

3. TRACK PROJECTS

Use our Buying Platform to track the progress of your project and receive messages from suppliers.

100% FREE

This service is 100% free for buyers to use - this is because we are a supplier-funded network.

Drag, Drop, Source.

Drop files here to upload them

or

Select files
Maximum 10 files.
20 MB limit.
Allowed types: pdf, jpg, zip, dxf, dwg, doc, igs, stp, step, tif, xls, docx, xlsx, jpeg, slddrw, sldprt, ipt, bmp, edrw, pptx, rar, xps, ai, dae, stl, sat, gif, easm, pdx, txt, rtf.
Qimtek can post your project(s) to our Supplier Members with a Non Disclosure Agreement (NDA) that will need to be signed before they access any of your drawings or contact details. You can either upload your own above or use the generic Qimtek form.
Project Deadlines

Project Deadlines

Although it is widley known that Qimtek can help you to get quotes the same day, we suggest that to maximise your response you provide our Supplier Members up to five days to quote. If your project is more urgent than this please check the box below and we will be in touch.
We will endevour to get back to you within 2 hours to discuss and publish your project. (Monday to Friday between 9:00am and 5:00pm).
Quantity, Frequency & Project Description

Quick Post: Project Details

To help you to get the best possible response, prices and right type of suppliers in contact with you, please be as specific as you can. For example by letting the potential supplier know if there could be future work available might produce better quotes.
You can add up to 5 parts in this section. However, if you have more you can always upload a bill of materials file above or discuss this with your sourcing account manager when they contact you.
Your details

Your details

Name

What is the best method for suppliers to contact you?

We will be putting suppliers in contact with you directly so they can quote your project. Some suppliers may have questions so they can quote you correctly. Additionally, most suppliers usually like to follow up to see how they got on and all we ask is that you provide them with feedback, whether they have won the project or not. With this in mind what is the best method to reach you on (you can choose both)? 
 
Terms