Qimtek

Qualified subcontract engineering projects

Are you looking to grow your business with new long term customers from the manufacturing industry?

This is a list of projects from manufacturing buyers looking for new manufacturing partners in the UK. Supplier members have access to the drawings and buyer information so they can contact them directly.

143 Projects

Displaying 1 - 20 of 143

  1. Drawings count: 5

    Fabrication-General Fabrication (over 1 tonne)

    This company has an immediate order to place for these large aluminium planters with steel panels, which will be used as street furniture. Laser cutting and welding processes are required and quotes have been requested for 8 off. In addition, there may be scope for the chosen supplier to expand upon their involvement with the client moving forward.

  2. Drawings count: 1

    Fabrication-General Fabrication (over 1 tonne)

    This client currently seeks a supplier to assist in the manufacture of the attached frame and associate components. This project incorporates elements of sheet metal forming, cutting and welding, with a variety of finishes required. Those that are interested in being considered for this job are asked to make contact with the buyer directly to discuss; in addition, this could result in further opportunities once quality and reliability have been proven.

  3. Drawings count: 1

    Fabrication-General Fabrication (over 1 tonne)

    IMMEDIATE CAPACITY SOUGHT FOR URGENT PROJECT! This buyer, who has a massive £350,000 annual spend on subcontract fabrication work, seeks a supplier with immediate capacity who can undertake an urgent project on their behalf. A prompt response is vital, as due to its urgency, this project will be awarded as soon as the right supplier is found. The chosen supplier will be required to undertake the manufacture of the attached box section, for use within the construction industry. This company regularly has urgent enquiries of a similar nature and therefore, those who respond promptly and can offer good quality, as well as a fast turnaround, will be seen favourably.

  4. Drawings count: 2

    Fabrication-General Fabrication (over 1 tonne)

    This growing manufacturer of steam locomotives are currently over-capacity and are looking for a new supplier to assist with the manufacture of 2 off full-size water tanks. The tank capacities are 4600 gallons of water and 9 tonnes of coal and are to be formed of mild steel sheet metal in 6mm and 10mm thicknesses (or imperial measurement equivalents). The client has provided two options, and has no particular preference when choosing a supplier: 1) provide all the profiled parts unassembled for the client to construct the tanks themselves, or 2) profile all the parts and then assemble before delivery. The sketch drawings are for the 4600 gallon tank parts which is a slight modification to the original 4000 gallon tank design. The assembly drawing is for the original 4000 gallon capacity tank. The increase of 600 gallons capacity is provided by the provision of two additional sumps to the underside of the tank. No leak testing is required if assembly is completed, because additional parts will be added to the tanks by the client before leak tests are performed at a later stage. Due to the nature of these tanks, quality is paramount regardless of which of the two options is undertaken. There is an immediate order to place with other work available once a relationship is established.

  5. Drawings count: 2

    Fabrication-General Fabrication (over 1 tonne)

    This client is looking for a new supplier to provide quotes for the manufacture of 3 off stainless steel vessel plinth frames. This work calls for the welding of box section and sheet metal with additional machining and grinding work also required. Quotes are required for 3 off, which can be delivered one at a time if this is more suitable, with all three being delivered within 8 weeks of placing the order. The order is due to be placed in mid-April so will suit those with up-coming or current capacity. This will also lead to repeatable orders once the quality and reliability is proven. IMPORTANT: There is a non-disclosure agreement running with this enquiry. Please print this off, complete ALL sections, sign and date it and return the page to sourcing@qimtek.co.uk or fax 01256 394600. Once received, all drawings and documents will be released to your account.

  6. Drawings count: 5

    Fabrication-General Fabrication (over 1 tonne)

    This security construction company, who outsource in excess of £100,000 worth of fabrication each year, is looking to collaborate with a fabrication specialist who can manufacture storage racking on their behalf. The client is moving premises in the first quarter of 2019 and the racking in question will be used at their new facilities. It is essential that interested suppliers adhere to the client's specifications, although input is welcome regarding the best material to be used.

  7. Drawings count: 2

    Fabrication-General Fabrication (over 1 tonne)

    This fire suppression equipment manufacturer, who spends in excess of £75,000 a year on outsourced fabrication, would like to hear from interested parties regarding the ongoing production of the attached fire extinguisher brackets. These brackets are to be made from mild steel sheet, although a turnkey service will also be needed. A KAN-BAN solution would also be advantageous, as the client orders large quantities of these designs every year.

  8. Drawings count: 1

    Fabrication-General Fabrication (over 1 tonne)

    This automatic assembly manufacturing company, who spend a massive £1,000,000 a year on subcontract fabrication services, requires quotations from possible suppliers for this new design of coolant tank. The client is hoping to place an order for this item within the next month, making this a great opportunity for companies looking to fill capacity at the start of 2019.

  9. Drawings count: 1

    Fabrication-General Fabrication (over 1 tonne)

    This company operates within the printing industry and outsources over £500,000 worth of fabrication work every year. They are looking for quotes for 2 off cooling conveyor support frames which will be used within printing press machinery. The ideal supplier will be able to produce these parts economically and provide a high-quality end product; once a relationship has been established, further projects could be made available in addition to this ongoing requirement.

  10. Drawings count: 6

    Fabrication-General Fabrication (over 1 tonne)

    This buyer seeks a new supplier to assist with the regular production of a range of fabricated frames. This company spends over £300,000 a year on subcontract engineering and seeks a supplier with the capabilities to undertake all aspects of manufacture. This project will involve elements of cutting, folding, assembly and finishing, as well as a small amount of machining. The client is looking to increase their current supply base and as such, the successful supplier will receive ongoing and additional opportunities for work.

  11. Drawings count: 1

    Fabrication-General Fabrication (over 1 tonne)

    This OEM outsources in excess of £80,000 worth of fabrication work a year. They are looking to identify a turnkey supplier who can assist immediately with production of the attached stillage. The client is hoping to expand their base of subcontract fabricators and subsequently, the chosen supplier will be given the opportunity to manufacture this item - as well as similar designs - on a repeat basis moving forward.

  12. Drawings count: 3

    Fabrication-General Fabrication (over 1 tonne)

    This buyer is looking for a supplier with capacity to fabricate the attached emulsions filter assembly, which is to be used in the manufacture of gas burners. There is an order to place for this project with ongoing work made available to the successful supplier in future. This project incorporates aspects of cutting, drilling, folding and assembly and is to be manufactured from a mixture of mild steel and stainless steel.

  13. Drawings count: 1

    Fabrication-General Fabrication (over 1 tonne)

    A supplier is required for the production of a steel workbench, on behalf of a fellow Qimtek member.These are to be manufactured from 90x90 box section and must also include a separate steel top. These are for in-house use, and could lead to additional batches in varying sizes. Quality is of the upmost importance, the tables must be the exact same size as they must be flush when sat side-by-side . Those that are interested in being considered for this opportunity are asked to contact the buyer directly to discuss.

  14. Drawings count: 1

    Fabrication-General Fabrication (over 1 tonne)

    This is an immediate requirement for a new design of box handle, to be manufactured from bright mild steel bar. Quotes are sought for 2000 off, with ongoing batches to be discussed at a later stage. Please note that good value is an important element of this project and interested vendors are asked to quote their best price.

  15. Drawings count: 1

    Fabrication-General Fabrication (over 1 tonne)

    This heating manufacturer, who outsources over £80,000 of fabrication work a year, is moving premises and seeks a fabrication supplier to produce assembly stations for their new workshop. Production is due to commence in early January 2019, making this an ideal opportunity for a supplier who is looking to fill capacity moving into the new year.

  16. Drawings count: 3

    Fabrication-General Fabrication (over 1 tonne)

    This buyer who specialises in the manufacture of van ramps and outsources in excess of £100,000 of fabrication work each year, is looking for assistance with an access ramp, to be manufactured and installed as soon as possible. The ramp must be made in accordance with the specifications provided and quotes from companies who already specialise in ramp manufacture will be viewed favourably.

  17. Drawings count: 3

    Fabrication-General Fabrication (over 1 tonne)

    This buyer, with an annual spend of £70,000 on outsourced fabrication, is looking for a fabricator to manufacture the attached handrail posts for them on a regular basis. This post is required fully assembled, to be made from mild steel and supplied with a hot dip galvanised finish. There is an order to place with ongoing work available, making this an opportunity to win a new long-term customer as well as the project in question.

  18. Drawings count: 2

    Fabrication-General Fabrication (over 1 tonne)

    This buyer is looking for a fabricator with immediate capacity to manufacture the attached stillages, to be used in the medical/scientific industry. They are looking to increase their supplier base for these designs due to the increase in customer demand. There is an order to place for this ongoing job and similar projects may be made available to the successful supplier in future, as the client places over £60,000 worth of work with subcontract fabrication companies every year.

  19. Drawings count: 1

    Fabrication-General Fabrication (over 1 tonne)

    This buyer is looking for a fabricator with immediate capacity to manufacture the attached stillage, to be used in the medical/scientific industry. They are looking to increase their supplier base for this design due to the increase in customer demand. There is an order to place for this one-off job and similar work may be made available for the successful supplier in future, as the client places over £60,000 worth of work with subcontract fabrication companies every year.

  20. Drawings count: 2

    Fabrication-General Fabrication (over 1 tonne)

    This startup company, specialising in garden presentation units, requires a new supplier who can manage the fabrication of wall arms, channels and braces for a new hanging garden display design. Please note that assembly is not required in this instance, although assembly drawings have been provided for reference purposes. The requested price breaks range from 2 to 4 off across the set, with larger quantities to be ordered once the initial requirement has been fulfilled.

Pages