Qimtek

Qualified subcontract engineering projects

Are you looking to grow your business with new long term customers from the manufacturing industry?

This is a list of projects from manufacturing buyers looking for new manufacturing partners in the UK. Supplier members have access to the drawings and buyer information so they can contact them directly.

12 Projects

Displaying 1 - 12 of 12

  1. Drawings count: 2

    Fabrication-General Heavy Fabrication 15mm Plus

    Fabricated tilt beams are required by a company that spends £200,000 a year in the subcontract fabrication market. A supplier is sought with the in-house capabilities needed to produce these items complete to the attached drawings, with a variety of similar work available moving forward. Interested parties are asked to provide their best price and delivery when quoting this project - additional, similar work will also be made available to the successful supplier once this enquiry has been completed .

  2. Drawings count: 2

    Fabrication-General Heavy Fabrication 15mm Plus

    This manufacturer of automated robotics systems requires a supplier to manufacture the attached rotating table and plate base. Suppliers able to offer both competitive pricing and high quality are best suited to this enquiry, any interested parties should make contact with the buyer directly in order to be considered.

  3. Drawings count: 0

    Fabrication-General Heavy Fabrication 15mm Plus

    This Nuclear project management company is looking for for possible suppliers who can assist with the manufacture of the attached heavy fabricated type B containers, which are transport vessels for nuclear waste material. Please note: The attached files are a detailed description of what is expected of the chosen supplier, further detail will be released to interested parties who make contact directly with the buyer.

  4. Drawings count: 1

    Fabrication-General Heavy Fabrication 15mm Plus

    This buyer requires a subcontract manufacturer to form free-issue blanks to suit the inside of a column dished head. This work will possibly involve heating and forming to a slight curve in one or two directions, with supplier input required regarding the best method of manufacture. This project is currently at the quotation stage but once the client's tender is successful, this could lead to ongoing work for the chosen supplier.

  5. Drawings count: 0

    Fabrication-General Heavy Fabrication 15mm Plus

    This company is seeking a supplier who is able to manufacture an escalator for use within a shopping centre. The chosen supplier will be required to measure up the site, as well as producing the unit as per the client's specifications. There is an immediate order to place for this enquiry, making it ideal for those with capacity to fill.

  6. Drawings count: 2

    Fabrication-General Heavy Fabrication 15mm Plus

    Destined for end use within automated welding equipment, the attached designs - including lids, caps and inserts - are to be cut and folded from mild steel, in various grades and thicknesses. The client is a company that subs out over £50,000 worth of fabrication work annually. They would like to partner with a supplier who can facilitate ongoing supply, with good value comprising an essential element of the project. Those that would like to be considered for this project are asked to make contact with the buyer directly; in turn, they may also be considered for similar work once a relationship has been cultivated.

  7. Drawings count: 6

    Fabrication-General Heavy Fabrication 15mm Plus

    A selection of mild steel frames, legs and supports - for use within special purpose machines - are sought, on behalf of a buyer who spends £100,000 annually on outsourced fabrication.

  8. Drawings count: 1

    Fabrication-General Heavy Fabrication 15mm Plus

    The three attached outfall covers will be used to prevent shingle passing through in high tides/stormy weather. The company behind this enquiry would like to partner with an external fabrication supplier for their production, with 1 off of each required as per the attached drawing. These items are comprised of an outer frame and inner mesh and are to be fabricated from galvanised steel. Interested suppliers must be able to adhere to the time frame specified. The buyer spends £100,000 a year in the subcontract fabrication market and therefore, further work may be made available once a relationship has been established.

  9. Drawings count: 3

    Fabrication-General Heavy Fabrication 15mm Plus

    The company behind this enquiry spends over £1 Million annually on all outsourced services and would like to establish contact with suppliers that can produce the attached stainless steel cone. Varying grades of steel, with varying thickness are required to be cut, folded, rolled and welded to produce the cone. Initially, only 1 is required for sample purposes, however a production run of 29 will follow.

  10. Drawings count: 1

    Fabrication-General Heavy Fabrication 15mm Plus

    The two attached staircases are required, along with a supporting structural stringer. The client is a company that specialises in architectural design and seeks quote for these units to be manufactured and delivered by February 2018. They request supplier input on various aspects of the design and will favour quotes from those that can support them in this process. There is also scope for the successful vendor to build upon their relationship with the buyer, diversifying into additional projects as they become available.

  11. Drawings count: 5

    Fabrication-General Heavy Fabrication 15mm Plus

    This company is looking for a supplier to undertake the manufacture and installation of two different designs of ramp that adhere to the requested specifications. The enquiry itself will be an excellent fit for those with immediate capacity, as a non-negotiable lead time of six weeks from order placement is required. With a £100,000 spend on the services of subcontract fabrication companies, the client may also wish to utilise the service of the chosen vendor within similar projects moving forward.

  12. Drawings count: 1

    Fabrication-General Heavy Fabrication 15mm Plus

    The manufacture of two different designs of furnace is required, by a company that outsources fabrication work to the tune of £200,000 a year. They are looking to grow their supplier base for these units - as well as similar designs - by building long-term relationships with new subcontract vendors. Interested parties will need to have the in-house facilities to handle fabrications of this size and weight, as well as the immediate capacity available to fulfil the initial order.