Qimtek

Qualified subcontract engineering projects

Are you looking to grow your business with new long term customers from the manufacturing industry?

This is a list of projects from manufacturing buyers looking for new manufacturing partners in the UK. Supplier members have access to the drawings and buyer information so they can contact them directly.

206 Projects

Displaying 1 - 20 of 206

  1. Drawings count: 13

    Machining-Milling, High Volume

    This manufacturer of plumbing hand-tools, who outsources approximately £10,000 worth of machining each year, is currently in need of a machinist who can assist with the attached tapspanner clamps. There is an immediate order to place for this enquiry with repeat orders expected either every six months or yearly, depending on stock.

  2. Drawings count: 1

    Machining-Milling, Medium Volume

    This engineering manufacturer is in need of assistance from a machining supplier who can assist with the immediate - as well as repeat - production of the attached mild steel angled bars, on behalf of their end client. This design is to be used within a new park ride - as such, the batch quantity and frequency is not yet known, but will be dictated by customer demand moving forward.

  3. Drawings count: 2

    Machining-CNC Machining, Low Volume

    This manufacturer of wooden children's playgrounds is currently in need of a supplier who can assist with the manufacture of the attached range of steel parts. There is an immediate order to place for this enquiry, with delivery required at the beginning of September or earlier if possible. This is a one-off requirement at this stage, although it may lead to additional, project-driven work for the chosen supplier once a relationship has been established.

  4. Drawings count: 2

    Profiling-Laser cutting, tube

    This security manufacturing company, who outsources approximately £100,000 worth of fabrication and associated processes each year, is currently in need of quotations from prospective suppliers for the attached range of box section parts.These will be assembled in-house, and are to be used within surveillance towers. There is an immediate, urgent order to place for this enquiry, with delivery required at the supplier's earliest convenience - ideally within 6 weeks of order placement. This order is expected to be repeated to the tune of 50 sets per year, with order quantities of either 5 or 10 sets per order.

  5. Drawings count: 1

    Finishing-Shot Blasting

    This manufacturer of guardrails is in the first phase of developing a rail that is destined for use aboard ships. Due to delivery delays from the current supplier, they are now keen to hear from Qimtek members who can undertake the required shot blasting and powder-coating of these free-issued parts. There is an immediate order to place, with a further 1200 off units required throughout the duration of the project.

  6. Drawings count: 1

    Machining-Milling, Medium Volume

    This engineering manufacturer is in need of assistance from a machining supplier who can assist with the immediate - as well as repeat - production of the attached spacer block, on behalf of their end client. This design is to be used within a new park ride - as such, the batch quantity and frequency is not yet known, but will be dictated by customer demand moving forward.

  7. Drawings count: 3

    Machining-Turning, High Volume

    The assistance of a machining supplier is sought, in order to produce a hexagon bolt in accordance with the drawing provided. These parts are to be made from aluminium alloy and will potentially pave the way to ongoing work from the company in question. There is an immediate order to place with the successful supplier.

  8. Drawings count: 1

    Machining-CNC Machining, Low Volume

    This manufacturer of hydraulic equipment has a new design for some of their products, for which they require the assistance of a machinist to manufacture the attached blanks to be used. There is an immediate order to place for this enquiry, with delivery required on/around August 5th 2019. As it is project-based, this is a one-off requirement, although it may lead to additional, similar enquiries for the chosen supplier going forward.

  9. Drawings count: 1

    Fabrication-Tube Bending & Manipulation

    This medical equipment manufacturer, who outsources approximately £100,000 worth of fabrication each year, is currently looking for quotes from prospective suppliers who can assist with the immediate manufacture of the attached range of mild steel components. There is an immediate order to place for this enquiry and although this is a one-off requirement for this range of components, the chosen supplier may be asked to produce additional, similar parts going forward.

  10. Drawings count: 6

    Finishing-Wet painting

    The scientific testing centre at the University of Liverpool has undertaken a new photolysis (separation of molecules by light) project and are in need of a supplier who can assist them by applying an opaque coat to a high volume of free-issued test vials. This coating is to absorb all visible light (example photos attached) and would ideally block UV rays as well, thus protecting the contained substance from exterior light, which interferes with test results. This is a one-off requirement with an immediate order to place and therefore, interested suppliers are asked to make contact at their earliest convenience.

  11. Drawings count: 2

    Electronic / Electrical-Design, Development & Prototyping

    This innovation manufacturer is looking to expand their profile into home alert systems and would like the assistance of a supplier who can manage the design of the PCB required within this system. The buyer is looking to get started with this project as soon as possible and will need to work with the chosen supplier; therefore, please be aware that final production may take some time. This will be a one-off requirement, with possible enhancements/future development required.

  12. Drawings count: 1

    Machining-Machining, Plastics

    This manufacturer of plumbing hand-tools, who outsources approximately £10,000 worth of machining each year, is in need of a turning supplier who can assist with the manufacture of the attached clamps. There is an immediate order to place for this stock order enquiry, which is to be repeated every two to three years.

  13. Drawings count: 6

    Plastic & Rubber-Injection Moulding

    This manufacturer of cameras and camera accessories is interested in hearing from suppliers who can assist with a new range of glass holders for both initial and ongoing production. There are various sizes required in the long term, but initially the buyer is looking for quotations on the largest size, with the manufacture of the smaller ranges to follow. Although there is no immediate order to place for this enquiry, the buyer is hoping to go to market with these parts at the end of September and therefore, the initial order is expected to be placed mid to late July. This is to be repeated on a yearly basis going forward.

  14. Drawings count: 3

    Fabrication-Fabrication with Machining

    This manufacturer of friction components, who outsources approximately £55,000 worth of machined parts a year, has recently designed a new range of brake discs. However, they are struggling to find a supplier who can manage both the profiling and the machining required, as one of the discs incorporates a step. There is an immediate order to place for a sample set, which will be repeated going forward with an annual expectancy of 300-700 sets.

  15. Drawings count: 3

    Machining-Milling, High Volume

    This manufacturer of commercial vehicle couplings, who outsources approximately £700,000 worth of machining each year, is looking to improve the quality and lead times of their current supply chain. Therefore, they would like to hear from suppliers interested in manufacturing the attached Slider Rails, which will involve milling, drilling and countersinking. Samples, quality testing and audits will all be required before production is redistributed, but once this has been completed, there will be an immediate order and ongoing work, with the delivery schedule to be arranged with the chosen supplier. IMPORTANT: There is a non-disclosure agreement running with this enquiry. Please print this off, complete ALL sections, sign and date it and return the page to sourcing@qimtek.co.uk or fax 01256 394600. Once received, all drawings and documents will be released to your account.

  16. Drawings count: 4

    Profiling-Laser Cutting

    This manufacturer of commercial vehicle couplings, who outsources approximately £150,000 worth of fabrication and associated processes each year, is looking to improve the quality and lead times of their current supply chain. Therefore, they would like to hear from suppliers interested in manufacturing the attached mounting plates, which will involve cutting and countersinking. Samples, quality testing and audits will all be required before production is redistributed, but once this has been completed, there will be an immediate order and ongoing work, with deliveries ideally required approximately every 10 weeks (to be confirmed with the chosen supplier). IMPORTANT: There is a non-disclosure agreement running with this enquiry. Please print this off, complete ALL sections, sign and date it and return the page to sourcing@qimtek.co.uk or fax 01256 394600. Once received, all drawings and documents will be released to your account.

  17. Drawings count: 4

    Fabrication-Light Fabrication (under a tonne)

    This manufacturer of commercial vehicle couplings, who outsources approximately £150,000 worth of fabrication each year, is looking to improve the quality and lead times of their current supply chain and would like to hear from suppliers interested in manufacturing the attached torsion tubes. Samples, quality testing and audits will all be required before production is redistributed, but once this has been completed, there will be an immediate order and ongoing work, with deliveries approximately every 10 weeks(to be confirmed with the chosen supplier). IMPORTANT: There is a non-disclosure agreement running with this enquiry. Please print this off, complete ALL sections, sign and date it and return the page to sourcing@qimtek.co.uk or fax 01256 394600. Once received, all drawings and documents will be released to your account.

  18. Drawings count: 4

    Fabrication-Light Fabrication (under a tonne)

    This manufacturer of commercial vehicle couplings, who outsources approximately £150,000 worth of fabrication each year, is looking to improve the quality and lead times of their current supply chain and would like to hear from suppliers interested in manufacturing the attached vehicle ramps. Samples, quality testing and audits will all be required before production is redistributed, but once this has been completed, there will be an immediate order and ongoing work, with deliveries ideally required on a weekly basis (to be confirmed with the chosen supplier). IMPORTANT: There is a non-disclosure agreement running with this enquiry. Please print this off, complete ALL sections, sign and date it and return the page to sourcing@qimtek.co.uk or fax 01256 394600. Once received, all drawings and documents will be released to your account.

  19. Drawings count: 6

    Machining-Machining, Prototyping

    This medical equipment manufacturer who outsources approximately £100,000 worth of machining every year, is currently looking for quotes from prospective suppliers who can assist with the immediate manufacture of the attached range of metal and plastic components. With an immediate order to place, quotes are also sought for ongoing production volumes from companies capable of managing this stage of the project.

  20. Drawings count: 1

    Plastic & Rubber-Plastic & rubber extrusion

    This medical appliance manufacturer specialises in hoist & chair systems and spends over £100,000 a year on bespoke plastic & rubber components. They are in need of a supplier who can manufacture the attached track infill on their behalf. This enquiry is currently in the quotation stage and therefore, the buyer seeks indications of the associated costs and lead-times. There will be an order to follow, which is expected to be repeated going forward; however, the order frequency is unknown at this point. Ideally, the buyer would like to receive quotes prior to Thursday 2nd May, although they will still be accepted after this date.

Pages